The Elites Network for Sustainable Development (ENetSuD) says Kwara State inflated the Offa Community Secondary School contract sum by 3.7 million.

A statement by the Press Secretary ENetSuD, Saeed Tijjani, said, “the contract sum on the Bill of Quantity (BoQ) approved for the project by the Kwara State Ministry of Education is ₦27,625,620.44.

“However, ENetSuD’s re-calculation of the project’s contract sum shows that the correct contract sum ought to be ₦23,888,786.81.

“The difference between the approved contract sum by the Ministry and the one re-calculated by ENetSuD is ₦ 3,736,833,63.

https://www.newshubmag.com/stop-being-partisan-kpf-warns-enetsud/

“The excess amount results from various irrelevant items alien to the preparation of a standard Bill of Quantity (BoQ) that the Ministry inserted into it.”

The project of Community Secondary School Offa has components including the renovation of administrative block, renovation of staff room to be converted to a library, construction of 2 room toilets, construction of a geographical garden, and supply and installation of instructional materials, teaching aids, and laboratory equipment.

The breakdown of how ENetSuD arrived at the inflated contract sum can be viewed on ENetSuD App under the 2020 projects tracking report or can be downloaded from our website through the link

https://enetsud.org/2022/05/17/contract-sum-of-community-sec-sch-offa-project-inflated-by-kwsg-with-%e2%82%a63-7-million/.